Free test summary report template (Excel and Markdown)
The report that closes a test cycle: what was tested on which build, what was not, what was found, which exit criteria were met, and a recommendation the release owner can act on.
A test summary report tells the people who decide on a release what was tested, on which build, what was not tested and why, the results by area, the defects by severity and status, the requirement coverage, which exit criteria were met, and a recommendation: go, go with conditions or no-go. Download it as one Markdown report or an Excel workbook that calculates the totals and pass rate with formulas.
What a test summary report is for
A test summary report closes a test cycle. It turns weeks of runs, results and bugs into one or two pages that someone who was not in the testing can read in five minutes and act on. Its job is to support a decision, usually whether a build ships, so it ends in a recommendation, not just a table of numbers.
It has several readers, and each reads a different part. The release owner, often a product owner or head of a business area, reads the recommendation, the exit criteria and the conditions. The engineering lead reads the open defects and risks. Support and customer service read the known issues that ship. Months later, an auditor or a new team member reads it to find out what was known when the release went out, which is why it names the exact build and links the evidence.
Write it at the end of a test cycle, after the last results are in and before the go/no-go meeting. It reports against the lean test plan: the plan set the scope and exit criteria before testing started, and the summary says what happened to each. The go/no-go checklist is where the meeting checks the criteria; the summary report is the document it reads beforehand and keeps afterwards.
What is in the template
Both downloads hold the same report, filled with one example: Checkout 2.4, the release used by the other templates on this site. The Excel version puts it on six sheets (How to use, Summary, Results by area, Defects, Exit criteria and Recommendation). The Markdown version is one page for a wiki, a pull request or the release ticket.
| Section | What to write | Who reads it closely |
|---|---|---|
| Recommendation | Go, go with conditions or no-go, with two or three sentences of why. It comes first. | Release owner |
| Scope and build | The exact build, the test window, the environments, and what was new, changed and regression. | Everyone |
| Not tested | Each area left out, why, and the risk it leaves. | Release owner, engineering lead |
| Results by area | Passed, failed, blocked, skipped and not run per area, with the pass rate. | QA and engineering leads |
| Defects | Counts by severity and status, then every open defect that ships with its workaround and owner. | Engineering lead, support |
| Requirement coverage | Each requirement in scope with its tests and its status. | Product owner |
| Risks and known issues | What could still go wrong, and what reduces it. | Release owner |
| Exit criteria | Each criterion from the test plan with its threshold, the measured value and Met: yes or no. | Release owner |
| Conditions and sign-off | What must happen for a conditional go, who owns it and by when, and who signed. | Release owner, auditor |
Scope, build, and what was not tested
Name the exact build the results belong to, such as 2.4.0-rc2, not “the release candidate”. If testing spanned several builds, say which results are on which build, and report the latest result of each test on the build that will ship. A pass on rc1 says little about rc2 if the code under it changed.
The not-tested list is the section readers skip and later wish they had read. Give every item a reason and the risk it leaves, because “not tested” with no reason reads as “forgotten”. In the example, gift cards are out because they are not in the release, load testing was done by another team, Safari on iPad was not in the plan, and live payments are only checked by a smoke test after release. Each of those is a fact the release owner accepts by signing, so they need to see it.
Results by area
Report results by feature area, not by tester or by day. The release owner thinks in areas (payment, discounts, refunds), and a weak area hides inside a good total. Keep five columns of counts so nothing disappears into “other”: passed, failed, blocked, skipped and not run.
Use the same rules as the test plan and the go/no-go checklist, so the numbers agree everywhere: pass rate = passed ÷ executed, where executed means passed, failed or blocked. Skipped and not run tests lower completion; they never raise the pass rate. Count each test once, by its latest result on the reported build, so a failure that was fixed and retested counts as a pass and is not counted twice.
| Area | Tests | Passed | Failed | Blocked | Skipped | Not run | Pass rate |
|---|---|---|---|---|---|---|---|
| Checkout > Payment | 14 | 14 | 0 | 0 | 0 | 0 | 100% |
| Checkout > Discounts | 10 | 9 | 1 | 0 | 0 | 0 | 90.0% |
| Checkout > Guest | 6 | 6 | 0 | 0 | 0 | 0 | 100% |
| Orders and refunds | 12 | 12 | 0 | 0 | 0 | 0 | 100% |
| Order emails | 6 | 6 | 0 | 0 | 0 | 0 | 100% |
| Total | 48 | 47 | 1 | 0 | 0 | 0 | 97.9% |
Defects by severity and status
Show two things: a count of defects by severity and status, and a short list of every open defect that ships. The count shows the shape of the cycle; the list is what support and the release owner need. Use the severity definitions from the bug report template, so a Major in this report means the same as a Major in the bug log.
Treat Resolved separately from Closed. Resolved means a developer fixed it; until someone retests it, it is still a risk, and the report should say how many are waiting.
| Bug | Severity / priority | Status | What the report says |
|---|---|---|---|
| BUG-41 Declined card empties the cart on Safari (iPhone) | Major / High | Closed | Fixed in rc2; CHK-2 passed on Safari on iPhone. |
| BUG-42 Discount applied twice | Critical / Critical | Closed | Fixed in rc2; CHK-3 passed and an exploratory retest found nothing. |
| BUG-43 Email subject reads “Your oder” | Trivial / Medium | Closed | Fixed in rc2. |
| BUG-44 Card brand shown in lower case | Minor / Low | Open | Ships as a known issue; planned for 2.4.1. |
| BUG-52 Finance export folds the discount into the item price | Major / High | Open | Ships under a condition with a manual workaround; see the recommendation. |
Requirement coverage, risks and known issues
Pass rate is about tests; the release owner cares about requirements. List each requirement in scope with its tests and its status, using the rules from the requirements traceability matrix template: passing only when every linked test passes, failing when any is failed or blocked. In the example, 4 of 5 requirements in scope pass. REQ-14 fails, because CHK-9, written after UAT found BUG-52, fails on rc2. A 97.9% pass rate and a failing requirement are both true, and the report shows both.
Risks are what could still go wrong after everything above. Keep them short and specific, each with what reduces it: “BUG-41 was specific to Safari on iPhone and Safari on iPad was not tested; watch declined-payment errors by browser for the first week” is useful, “some edge cases may remain” is not. Known issues are the open defects that ship. Name them, so support hears about them from the report and not from customers.
Exit criteria: met or not
Copy the exit criteria from the test plan word for word, with their thresholds, and answer each with yes or no next to the measured value. Do not reword a criterion that was missed, and do not change a threshold after the results are in. If a criterion is missed and the release still goes ahead, write the exception under it: what is accepted, by whom and until when.
| Criterion | Threshold | Measured | Met? |
|---|---|---|---|
| X1 Every test in scope has a final result | 100% | 48 of 48 | Yes |
| X2 Pass rate of executed tests | ≥ 95% | 47 of 48 (97.9%) | Yes |
| X3 Critical-priority tests failing or blocked | 0 | 0 | Yes |
| X4 Open bugs of critical priority or blocker severity | 0 | 0 | Yes |
| X5 Requirements in scope passing, and none failing | ≥ 80% and 0 failing | 80%; REQ-14 failing | No |
How to write the recommendation honestly
The template offers three recommendations. Go: every exit criterion is met and no open issue needs a condition. Go with conditions: the release can ship if named things happen, each with an owner and a date, and any missed criterion has a written exception from the person who owns that risk. No-go: a criterion that protects customers is missed and no workaround makes the risk acceptable, so the build should not ship as it is; say what would change the answer.
QA recommends; the release owner decides. Keeping those apart is what lets the report stay honest. Your job is to make the evidence impossible to misread, not to make the decision comfortable.
- Lead with the answer. Put the recommendation at the top in one word, then the reasons. A reader who stops after three lines should still know what you think.
- State the missed criteria in the first paragraph. A go that mentions the failing requirement on page two is a go the reader did not agree to.
- Make conditions checkable. “BUG-52 fixed in 2.4.1 and CHK-9 passes on it, by a date, owned by a named developer” can be checked later. “Minor issues to follow” cannot.
- Do not average away a failure. 97.9% overall does not cancel a failing requirement or a failing critical test. Report the exception, not the average.
- Say what would change your mind. For a no-go, name the fix and the retest that would turn it into a go. For a go, name the signal after release that would make you call for a rollback.
- Never sign your own exception. An exception is accepted by the person who owns the business risk, not by the tester who found it.
A worked example: the Checkout 2.4 recommendation
This is the top of the Markdown download, for the same checkout release as the UAT test plan template, where the business owner accepted BUG-52 with a workaround. One exit criterion is missed, so the honest recommendation is go with conditions, with the exception and the conditions written down rather than a plain go.
# Test summary report: Checkout 2.4
Build tested: 2.4.0-rc2 (2.4.0-rc1 from 2026-11-16 to 2026-11-18)
Test window: 2026-11-16 to 2026-11-24
Report date: 2026-11-25
## 1. Recommendation
Go with conditions
All 48 system and regression tests in scope have a result, and 47 of 48
executed tests passed (97.9%). No critical-priority test is failing and no
critical bug is open. One exit criterion is not met: REQ-14 fails because of
BUG-52, a finance export defect with a manual workaround that the business
owner accepted in UAT. We recommend Go only with the conditions below.
## 9. Conditions
1. Until 2.4.1 ships, the finance analyst adds discounts by hand from the
order report. 2.4.1 includes the BUG-52 fix, and CHK-9 passes on it.
Owner: developer on call. Due: [YYYY-MM-DD]
2. BUG-44 and BUG-52 are listed as known issues in the release notes.
Owner: product owner. Due: before release
3. After release, the production smoke test is run: one real order,
refunded the same day. Owner: QA lead. Due: release dayCommon mistakes
- Numbers without a recommendation. A page of tables leaves the decision to whoever reads it fastest. Say what you recommend.
- No build number. Results “on staging” cannot be matched to what shipped.
- Counting retests twice. A test that failed and then passed is one test with one latest result, not one failure and one pass.
- An empty not-tested section. Something was always left out. If the section is empty, the reader assumes everything was tested.
- Resolved bugs counted as fixed. Until a retest passes, a resolved bug is still open risk.
- Rewriting the criteria to fit the results. Report against the plan as agreed; argue for a different threshold before the next release.
Keep it in a spreadsheet or in Git
In the Excel version, you type the counts per area on the Results by area sheet; tests in scope, executed, pass rate and completion are formulas, and a Total row adds them up. The Defects sheet has dropdowns for severity, priority and status, and the Summary sheet counts open defects by severity, open defects of blocker or critical severity or critical priority, requirements passing and exit criteria met, with COUNTIF, COUNTIFS and SUMPRODUCT. The Recommendation sheet holds the decision, the conditions, the residual risks and the sign-off. It has no macros and opens in Excel, Google Sheets and LibreOffice.
The Markdown version is one report. Keep it in the repository or the release ticket next to the test plan, so the plan and its outcome sit side by side, and changes after sign-off show up in history.
Building the report from TestPlum
The slow part of a summary report is collecting the numbers: results from several runs and builds, open bugs, requirement statuses, and which criteria pass. In TestPlum those come from the results already recorded.
A release has its own runs, requirements and thresholds. The project home answers Ready or Not ready for it, with one sentence per problem, most blocking first. The release page shows every check with its evidence and target, the runs in the release and the requirements, and Print report gives a page for the go/no-go meeting with sign-off lines. Each test counts once per environment by its newest result there, so a retest replaces the failure it fixed. Requirement statuses (passing, failing, partial, not run, not covered) are worked out from the latest results, and the traceability matrix shows requirements, tests and results together. See release readiness.
For a single run, the printer button and Export CSV give its results to share, and Sign off locks them. Compare runs sets two runs side by side, such as rc1 and rc2, and groups the tests into newly failing, fixed, still failing, newly passing or run for the first time, and only in one run, which is the “what changed since the last build” paragraph. When the release ships, Ship records the verdict with your name and the time; shipping while Not ready asks for a reason, which is kept in the audit log. The not-tested list, the risks and the recommendation stay yours: TestPlum does not write them for you. See test runs and the user guide.
Download
Frequently asked questions
What is a test summary report?
A short document written at the end of a test cycle that says what was tested on which build, what was not tested and why, the results by area, the defects by severity and status, requirement coverage, which exit criteria were met, and a recommendation: go, go with conditions or no-go.
What is the difference between a test summary report, a test report and a test closure report?
Teams use the names loosely. Test report is the broad term for any report on testing, including daily or weekly progress reports during a cycle. A test summary report comes at the end of a cycle and supports a release decision. A test closure report is often written when a whole test project or phase ends, and adds lessons learned, archived evidence and what to reuse. Many teams use one document for the last two; what matters is that it ends in a recommendation.
Who writes and who signs the test summary report?
The QA or test lead usually writes it and signs to confirm it is complete and accurate. The release owner, often a product owner or the head of the business area, signs the decision. Anyone who accepts an exception, such as the owner of a failing requirement, should sign that exception by name.
Can QA recommend go if an exit criterion is not met?
Yes, as go with conditions, if the missed criterion has a written exception from the person who owns the risk, and every condition has an owner and a date. If the missed criterion protects customers and nothing makes the risk acceptable, the honest recommendation is no-go, with what would change it.
How long should a test summary report be?
One or two pages for most releases. The recommendation and exit criteria should fit on the first screen. Link to the runs, the bug list and the traceability matrix instead of copying them in.
Should the report include results from earlier builds?
Report the latest result of each test on the build that will ship, and mention earlier builds only to explain what changed, such as a failure on rc1 that was fixed and passed on rc2. Counting both results double-counts the test.